Delivering Rapid Results
Nickel Alloy Vessels
We delivered 13 of these essential nickel alloy vessels in just 10 weeks. The project totaled over 1200 linear feet of welding to support our customer’s eco-friendly production process. We solution annealed each piece, and we performed post-weld heat treatment (PWHT) and phased array ultrasonic testing (PAUT).
Refinery Tower
We built this 268′ petrochemical refining tower in just 26 weeks. To accelerate the turnaround, we fabricated the bottom half in Natchez, Mississippi and the top half in Cincinnati, Ohio, before combining the two halves and shipping the tower for installation.
5 Process Columns
We fabricated 5 of these columns in just 21 weeks. When it required these columns to keep its patent alive, our customer turned to Enerfab. Each of these columns was designed, fabricated, painted, and insulated — all while spanning over major holidays. We accelerated every project phase by running engineering, procurement, and fabrication in parallel — not in sequence — to meet our customer’s critical deadline.
Lethal
Service Vessel
We delivered this lethal service vessel in 12 weeks. Our chemical customer called for this 10'x40' lethal service vessel with platforms. In the three-month project window, we completed engineering, procurement, firm price work, and T&M fabrication.
Oil & Gas
Condensate Vessel
We fabricated this vessel in 3 weeks. Our chemical customer needed to replace a code vessel after removing the original from service. This vessel required post-weld heat treatment, hydro testing, and a multi-coat paint system which we completed in three weeks.
Reactor Rebuild
- Fabricating the bottom portion of this vessel, including the internal coils
- Fabricating the head and nozzles
- Field repairing the shell and body flange
- Installing a liner plate for damaged overlay
Shift Gas
Separator
This shift gas separator was completed in 4 weeks. Our chemical customer needed this critical piece of equipment following an unforeseen catastrophic failure. We fabricated this 2"+ thick, high-pressure alloy vessel, including custom forgings, over the Thanksgiving holiday.
2 Duplex 2205 Vessels
Three of these Duplex 2205 vessels were built in five weeks. Our chemical customer needed three Duplex 2205 pressure vessels on skirts to get their process up and running quickly.
The Benefits of Working with
Bishopric Industries
With the right team in place, trust between our organizations, and constant communication between all stakeholders, we can execute successful projects against seemingly impossible timelines without sacrificing the quality our customers expect from us.
Deep Experience
Multiple Shops
Seamless Collaboration
Immense Capacity & Skilled Labor
We can get you back up and running. Fast.