When Others Say, Heck No,
We Say, Let's Go!

Where traceability, compliance, and product purity aren’t just promises, they’re built into every tank. See traceability and compliance built in before you buy.
Rapid Response Fabrication by Bishopric Industries

When it hits the fan,
we have a plan.

The brutal reality is that your critical process equipment can have unforeseen failures — and in those moments, you need a partner that can get you back up and running as quickly as possible. When our customers (and many of our competitors) say, “Absolutely not! That’s impossible,” about the turnaround times we propose, we say, “Absolutely yes! It is totally possible, and here’s our plan to get it done.”
Rapid Response Fabrication in Action

Delivering Rapid Results

10 Weeks

Nickel Alloy Vessels

We delivered 13 of these essential nickel alloy vessels in just 10 weeks. The project totaled over 1200 linear feet of welding to support our customer’s eco-friendly production process. We solution annealed each piece, and we performed post-weld heat treatment (PWHT) and phased array ultrasonic testing (PAUT).

26 Weeks

Refinery
Tower

We built this 268′ petrochemical refining tower in just 26 weeks. To accelerate the turnaround, we fabricated the bottom half in Natchez, Mississippi and the top half in Cincinnati, Ohio, before combining the two halves and shipping the tower for installation.

21 Weeks

5 Process Columns

We fabricated 5 of these columns in just 21 weeks. When it required these columns to keep its patent alive, our customer turned to Enerfab. Each of these columns was designed, fabricated, painted, and insulated — all while spanning over major holidays. We accelerated every project phase by running engineering, procurement, and fabrication in parallel — not in sequence — to meet our customer’s critical deadline.

12 Weeks

Lethal

Service Vessel

We delivered this lethal service vessel in 12 weeks. Our chemical customer called for this 10'x40' lethal service vessel with platforms. In the three-month project window, we completed engineering, procurement, firm price work, and T&M fabrication.

3 Weeks

Oil & Gas
Condensate Vessel

We fabricated this vessel in 3 weeks. Our chemical customer needed to replace a code vessel after removing the original from service. This vessel required post-weld heat treatment, hydro testing, and a multi-coat paint system which we completed in three weeks.

10 Days

Reactor Rebuild

We rebuilt this reactor in just 10 days. The rebuild called for new C22 material and included:
  • Fabricating the bottom portion of this vessel, including the internal coils
  • Fabricating the head and nozzles
  • Field repairing the shell and body flange
  • Installing a liner plate for damaged overlay
4 Weeks

Shift Gas

Separator

This shift gas separator was completed in 4 weeks. Our chemical customer needed this critical piece of equipment following an unforeseen catastrophic failure. We fabricated this 2"+ thick, high-pressure alloy vessel, including custom forgings, over the Thanksgiving holiday.

5 Weeks

2 Duplex 2205
Vessels

Three of these Duplex 2205 vessels were built in five weeks. Our chemical customer needed three Duplex 2205 pressure vessels on skirts to get their process up and running quickly.

The Benefits of Working with
Bishopric Industries

With the right team in place, trust between our organizations, and constant communication between all stakeholders, we can execute successful projects against seemingly impossible timelines without sacrificing the quality our customers expect from us.

Deep Experience

These projects require trust. Critical work often needs to begin before there’s a signed agreement to meet tight turnaround windows. We know what it takes to get these projects done right and on time, so we can help you navigate the situation, make decisions quickly, adapt even quicker, and work together to deliver what you need.

Multiple Shops

We condense timelines by putting tasks on parallel paths and in multiple shops. This can reduce the time needed to fabricate a piece of equipment by more than 50 percent.

Seamless Collaboration

Our success has come from dedicating a team of multi-disciplined project managers and engineers, which allows different departments to work efficiently together during moments of high stress when multitasking is required. And that team remains in constant communication throughout the project to keep planning, execution, and inspection aligned and reduce project delays.

Immense Capacity & Skilled Labor

Our shop capacity and craft workforce enable us to push the limits on what’s achievable because we have the room, the equipment, and the people to make your project happen, fast. We even fabricate tank heads in-house, expediting the fabrication of the equipment that often has the longest lead time.

We can get you back up and running. Fast.

Get in touch.

Rapid Response Fabrication by Bishopric Industries